180kw 240kw Ultra Fast DC Charging Station Floor Mounted New Energy EV Charger Station

Customization: Available
Connector Type: CCS1, CCS2, CHAdeMO, GB/T
Installation: Floor Type

Product Description

Basic Specifications

Location:
Public Use
Interfaces:
One Pile with Multiple Charges
Start Mode:
Credit Card, Mobile Remote, RFID
Weight:
300.0 Kilograms
Lead Time:
30 Days
Transport:
Wooden Pallet
Origin:
China
Capacity:
500,000 pieces/Year

Product Description

DC Charging Stations (Direct Current) are high-power EV charging units that bypass onboard converters, directly supplying DC electricity to vehicle batteries. These stations typically deliver 50-350kW power, enabling ultra-fast charging (10-30 minutes for 80% capacity). Key components include power conversion modules, cooling systems, and smart controllers with CCS/CHAdeMO connectors. Dominating highway corridors and urban hubs, DC chargers feature advanced safety protocols and dynamic load balancing. Unlike AC chargers, they're optimized for commercial use with 92-95% energy efficiency.

Visual Overview

Frequently Asked Questions

What is the charging speed of this DC station?
These high-power units deliver 50-350kW, allowing most electric vehicles to reach 80% capacity in just 10 to 30 minutes.
Which connector types are supported?
The stations are typically equipped with industry-standard CCS and CHAdeMO connectors to ensure compatibility with a wide range of EVs.
How can users initiate a charging session?
Users can start charging through multiple convenient methods, including Credit Card payment, Mobile Remote Operation, or RFID authentication.
What is the energy efficiency of these chargers?
Our DC charging stations are highly optimized for commercial use, achieving an energy efficiency rating of 92-95%.
Are these stations suitable for outdoor public use?
Yes, they are specifically designed for public use in highway corridors and urban hubs, featuring floor-mounted installation and robust safety protocols.
What is the typical lead time for an order?
The standard lead time for production and preparation of these units is approximately 30 days.

Related Products