❓
Frequently Asked Questions
What is the charging speed of this DC station?
Our DC charging stations deliver between 50kW and 350kW, allowing most electric vehicles to reach 80% battery capacity in just 10 to 30 minutes.
Which connector types are supported?
The units come equipped with industry-standard CCS (Combined Charging System) and CHAdeMO connectors, ensuring compatibility with a wide range of global EV models.
How efficient are these charging units?
The stations are designed for high-performance commercial use, offering an energy efficiency rating of 92% to 95%, which minimizes power loss during conversion.
What payment and activation methods are available?
Users can initiate charging sessions through multiple convenient methods, including credit card payments, RFID authentication, and mobile remote operations.
Are these stations suitable for outdoor public environments?
Yes, these units are specifically designed for public use in urban hubs and highway corridors, featuring disaster-resilient protocols and robust safety systems.
What is the typical lead time for an order?
The standard lead time for production and preparation is 30 days, with units securely packed on wooden pallets for safe transport.